  • Job: n° 097275 – NGC PHASE 1 PROJECT AT QUILUMA AND MABOQUEIRO - AZULE ENERGY - ANGOLA
    • Detail Engineering: Piperacks, process steel structures, shelters, equipments foundations, pits (2023-2024)
    • Total man-hours: 25.000hh
  • Job: n° 083118C –B4 PROJECT EPC PACKAGE 2 - BOROUGE - ABU DHABI
    • Detail Engineering: Piperacks and process steel structures (2024)
    • Total man-hours: 1.000hh
  • Job: n° 082755C – RDCG (ROTTERDAM CAPACITY GROWTH) PROJECT – NESTE - HOLLAND
    • Detail Engineering: Piperacks, process steel structures and related foundations (2023-2024)
    • Total man-hours: 5.000hh
  • Job: n° NC /22011 – ENHANCEMENT OF GAS COMPRESSION STATION IN POGGIO RENATICO (FE) - SRG - ITALY
    • Detail Engineering: Compressor shelter ELCO and internal steel supports (2023-2024)
    • Total man-hours: 2.000hh
  • Job: n° GLYI 12975 – GLYCERINE EARLY START-UP PROJECT – PTP ARGENT ENERGY - HOLLAND
    • Detail Engineering: Piperack and related foundations (2023)
    • Total man-hours: 500hh
  • Job n° 068486 – FEED – UMM SHAIF GAS CAP CONDENSATE DEVELOPMENT PROJECT PHASE-1 – ADNOC – ABU DHABI
    • Front End Engineering Design for Steel Structures and Civil Works (Years 2021-2022)
    • Total man-hours: 2500 hh
  • Job n° 0469 – FEED – VENICE LNG Terminal Porto Marghera (VE) - ITALY
    • Front End Engineering Design for Steel Piperack and related foundations (Year 2021)
    • Total man-hours: 500 hh
  • Job n° 022923 – SHAH GAS DEVELOPMENT (SGD) PROJECT – ADNOC – ABU DHABI
    • Connection details for Beneficial Engineering (Year 2021)
    • Total man-hours: 2500 hh
  • Job n° 023103 – IDC COMPRESSOR STATION DESIGN – GASTRANS - SERBIA
    • Compressor shelters, pumps shelters (Year 2020)
    • Total man-hours: 2.000 hh
  • Job n° 07985-01 – PIPING PREFABRICATION CAMP – RENCO - MOZAMBICO
    • Buildings foundations (Year 2020)
    • Total man-hours: 500 hh
  • Job n° 068486 – HAIL & GASHA PCKG 2 – ADNOC - ABU DHABI (UAE)
    • Sizing steel structures for FEED (Year 2020)
    • Total man-hours: 1.500 hh
  • Job n° 08001-61 – 250 MW POWER PLANT CCGT – RENCO - ARMENIA
    • Support piping steel structures (Year 2020)
    • Total man-hours: 3.000 hh
  • Job n° 19_035 – WASHINGTON STREET BUILDING - BOLINA INGEGNERIA - NEW YORK (USA)
    • TEKLA modeling reinforced concrete panels (Year 2020)
    • Total man-hours: 1.000 hh
  • Job n° 033899 –MARJAN INCREMENT WATER INJECTION FACILITIES - ARAMCO - SAUDI ARABIA
    • Pipelines anchor blocks system (Years 2019-20)
    • Total man-hours: 1.500 hh
  • Job n° 076551C – BAPCO MODERNIZATION PROGRAM - BAPCO - BAHREIN
    • Support tank steel skids (Years 2019-20)
    • Total man-hours: 2.500 hh
  • Job n° 032206 – KOC FEED PIPELINES FOR NEW REFINERY PROJECT (NRP) - KUWAIT
    • Steel Process structures, Steel PipeRacks (Year 2018)
    • Total man-hours: 2.000 hh
  • Job n° P1567 – CENTRALE DI COMPRESSIONE GAS SULMONA (AQ) – SNAM RETE GAS - ITALY
    • Adeguamento NTC2018 Pozzetti ELE-SMI e Vasche di Raccolta (Year 2018)
    • Total man-hours: 1.000 hh
  • Job n° 033884 – BARZAN PIPELINE PROJECT - QATAR
    • Steel Structures & foundations, BVS Station Civil Works (Year 2018)
    • Total man-hours: 1.600 hh
  • Job n° 07910-01 & 07920-01 – TAP KIPOI & TAP FIER & BILISHT – JV TERNA-RENCO - GREECE AND ALBANIA
    • Buildings design & foundations, process structures, compressor foundations (Year 2017-18)
    • Total man-hours: 7.000 hh
  • Job n° 4420000390 - TANGGUH EXPANSION PROJECT OFFSHORE GPF EPCI - INDONESIA
    • Piping supports on concrete piles (Year 2017)
    • Total man-hours: 1500hh
  • Job n° 2017-SEAT-MA-0007 – Deposito Oli Minerali di Gaeta – Gaeta (LT) - ITALY
    • Studio di vulnerabiltà sismica strutture in acciaio (piperacks e pensiline) (Year 2017)
    • Total man-hours: 700hh
  • Job n° 071973C – JEBEL ALI REFINERY EXPANSION PROJECT – ENOC PROCESSING COMPANY L.L.C. – UNIT 44 - DUBAI
    • Piperack concrete-steel structures design & foundations, process structures, vessels & exchangers foundations (Year 2017)
    • Total man-hours: 5.500 hh
  • Job n° 032197 – CORNEGLIANO LAUDENSE (LO) - NATURAL GAS STORAGE PLANT – ITALGAS STORAGE - ITALY
    • Piperack steel structures design & foundations, process structures, compressor foundations (Year 2016-17)
    • Total man-hours: 4.000 hh
  • Job n° P-1427 – SERGNANO (CR) – CENTRALE DI COMPRESSIONE GAS – SNAM RETE GAS - ITALY
    • Compressor foundations, pits, vessels foundations, auxiliaries foundations (Year 2016)
    • Total man-hours: 4.000 hh
  • Job n° 024120 – KASHAGAN FIELD DEVELOPMENT - TRUNK & PRODUCTION FLOW LINES – AGIP KCO - KAZAKISTAN
    • Process steel structures (Year 2016)
    • Total man-hours: 500 hh
  • Job n° 013036 – MARINE XII BLOCK – ENI CONGO - CONGO
    • Equipment foundations, drain system, piperack steel structures design & foundations, anchor bolts standards design, process structures, tank foundations, open drain pit, pit for vessel, pits, compressor foundation, pumps foundation, site earthworks, flare foundation, pipe support, sleepers, package foundations, finishing plan, road & fence layout (Year 2013-14-15)
    • Total man-hours: 11.000 hh
  • Job JSC MOZYR REFINERY - HYDROGEN PURIFICATION UNIT M-102 - BELARUS – JSC 'Mozyr OR' - BIELORUSSIA
    • Skids design in static and lifting condition (Year 2015)
    • Total man-hours: 400 hh
  • Job COMPLETE SHEDGUM-YANBU 1 PIPELINE PROJECT SHY-1 PIPELINE LOOP 4 & 5 – SAUDI ARABIA – ZAMIL STEEL - ARABIA SAUDITA
    • Shelter foundations and paving details (Year 2015)
    • Total man-hours: 400 hh
  • Job n° 022051 CAMPO DI STOCCAGGIO GAS BORDOLANO (CR) – STOGIT SNAM RETE GAS - ITALIA
    • Area Cluster A & B: Civil design of culverts, supports traps foundations, packages foundations, pits, shelter foundation (Year 2014-15)
    • Total man-hours: 400 hh
  • Job n° 032145/6/7 – WEST QURNA IRAQ MOD/OSBL/ISBL – EXXON MOBIL - IRAQ
    • Shallow concrete foundations, foundations on piles, vibrating machinery foundations, shelters, pits (Year 2013)
    • Total man-hours: 5.000 hh
  • Job MAFUMEIRA SUL PROJECT (MSP) offshore Cabinda province– CABINDA GULF OIL COMPANY - REP. OF ANGOLA
    • Process steel structures, piperacks, concrete foundations, anchor block on piles, supports on piles, sleepers, shelters, steel skids and related foundations, packages and vibrating machinery foundations, culverts, special stop structures (Year 2012-13)
    • Total man-hours: 8.000 hh
  • Job n° 032092 – New Booster Station BS-171 at West Kuwait - KUWAIT OIL COMPANY (KOC) - KUWAIT
    • Process steel structures, concrete foundations, retaining walls, deep pits, packages and machinery foundations (HP/LP Compressors) (Year 2010-11-12)
    • Total man-hours: 16.000 hh
  • Job n° 032076 – MENZEL SONATRACH -Menzel Ledjmet East project block 405B - ALGERIA
    • Process and piperacks steel structures, concrete foundations in Menzel Ledjmet East project block 405B, Algeria (Year 2009)
    • Total man-hours: 12.000 hh
  • Job n° 217913 - EL MERK - SAUDI ARABIAN OIL COMPANY - ALGERIA
    • Civil Technical Offer – Lot 2, Lot 3&4, Lot 7 - Site Facilities, Central Processing Facilities, Support Infrastructure for Oil and Gas Facilities in El Merk in Southern Algeria. (Year 2008)
    • Total man-hours: 800 hh
  • Job n° 666100 – SEAWATER PLAN QURAYYAH – SAUDI ARABIAN OIL COMPANY - UAE
    • Design of cable-pipe rack, steel structures, concrete foundations, retaining wall, AGC Canal, electrical manholes, sediment basin (Year 2006-07)
    • Total man-hours: 15.000 hh
  • Job n° 665200 - TARANTO (TA) – PRAOIL - Taranto Plus Sistema Logistico Sud - ITALY
    • Civil Technical Offer - Oleodotto Taranto - Brindisi e Oleodotto Taranto - Acerra con Stazione di Pompaggio Iniziale di Taranto e Deposito di Acerra (Year 2005)
    • Total man-hours: 3.000 hh
  • Job n° 658200 - ABU DHABI – ENGINEERING MAINTENANCE COMPANY (EMCO) - UAE
    • Structural Design Concrete Foundations and Steel Platform in Bu Hasa Facilities development in Abu Dhabi (Year 2004)
    • Total man-hours: 3.000 hh
  • Job n° 657900 – KUWAIT OIL COMPANY (KOC) – Installation of new BS-131 - KUWAIT
    • Disegni strutturali di Fondazioni in c.a. e Passerelle in carpenteria, Relazioni di calcolo per fondazioni di Vertical Air Vessel, Horizontal Vessel, Scrubber Vessels, Scrubber Traps, Valves, Trolleys, Jib Cranes, Dedicated Drain Sumps in Kuwait (Years 2002-03)
    • Total man-hours: 2.000 hh
  • Job n° 655500 – Qatar General Petroleum Corporation (QGPC) - QATAR
    • Design of cable-pipe rack, steel structures, concrete foundations (Year 2001)
    • Total man-hours: 2.000 hh

 BK STRUTTURE S.R.L.

POWER PLANTS ENGINERING SERVICE

61121 Pesaro, Italy
Via U. Foscolo, 29
Tel.: +39 0721 1627720
Tel.: +39 349 3014644
e-mail: info@bkstrutture.com
pec: bkstrutturesrl@pec.it
VAT: 02643540418
www.bkstrutture.com